Pioneer Mitra supplies JCB 3CX Tandem Gear Pump (Part No. 320/04133) to dealers in Saudi Arabia, UAE, Nigeria. OEM-grade aftermarket. 24-hour FOB India quote.
Submit your requirement — our export team replies with confirmed FOB pricing, stock and lead time within 24 hours.
Pioneer Mitra supplies JCB 3CX spare parts — including JCB 3CX Tandem Gear Pump and related components — from our New Delhi warehouse to dealers across the Middle East, Africa, and South Asia. Commonly ordered alongside JCB 3CX Boom Ram Seal Kit and JCB 3DX Main Hydraulic Pump to reduce machine downtime by completing all hydraulic service work in a single shutdown. We export this part regularly to Saudi Arabia and UAE, with full customs documentation — commercial invoice, packing list, certificate of origin, and bill of lading — included with every shipment. Use our parts price search to find pricing for 95,000+ parts across JCB, Komatsu, CAT, and Volvo machines.
Seal kit 320/04133-SK (USD 30–45) resolves external leaks only. No full replacement needed if pressure and flow are normal.
Replace when both loader and backhoe are slow simultaneously, or steering becomes heavy. Replace seal kit when shaft leak only with normal machine performance.
The tandem gear pump supplies two circuits simultaneously. Gear wear is accelerated in high-temperature GCC applications (Saudi Arabia, UAE, Qatar) where hydraulic oil temperature regularly exceeds 80°C.
If ignored: reduced flow to both circuits means simultaneous slow loader and slow backhoe — machine productivity drops 25–35%. Continued operation causes gear scoring and metal contamination of the entire hydraulic system.
Field stat: At 45°C ambient temperature, every 10°C rise in hydraulic oil above 80°C halves seal and pump life. A JCB 3CX in Saudi Arabia summer can see oil temperatures of 95–100°C without adequate cooling maintenance.
| Country | Port | Sea Freight | Air Freight | Import Duty |
|---|---|---|---|---|
| Saudi Arabia | Dammam | 9–12 days | 3–4 days | 5% + 15% VAT |
| UAE | Jebel Ali | 7–9 days | 24–48 hrs | 5% GCC |
| Nigeria | Lagos Apapa | 18–22 days | 4–5 days | Form M required |
| Kenya | Mombasa | 14–18 days | 3–4 days | IDF + Railway Levy + 0–25% |
All shipments: Commercial Invoice · Packing List · COO · BL/AWB · MSME: UDYAM-DL-01-0041218